LAUNCH COMPLEX 31/32 FACT SHEET
By Cliff Lethbridge
Aerial View Of Launch Complex 31/32 Circa 2018
Configuration: Two Blockhouses, Two Flat Launch Pads, Two Silos
LAUNCH PAD 31A
Current Status: Inactive
First Launch: February 1, 1961
Final Launch: March 14, 1970
Number of Launches: 4
Vehicles Launched: Minuteman I, Minuteman II
SILO 31B
Current Status: Contains Remains of Space Shuttle Challenger
First Launch: December 18, 1961
Final Launch: September 23, 1969
Number of Launches: 35
Vehicles Launched: Minuteman I, Minuteman II, Minuteman III
LAUNCH PAD 32A
Current Status: Inactive
First Launch: Never Used
Final Launch: Never Used
Number of Launches: None
Vehicles Launched: None
SILO 32B
Current Status: Contains Remains of Space Shuttle Challenger
First Launch: August 30, 1961
Last Launch: December 14, 1970
Number of Launches: 53
Vehicles Launched: Minuteman I, Minuteman II, Minuteman III
Launch Complex 31/32 was built in support of Minuteman missile testing. The site was constructed over existing Launch Complex 9/10, although elements of Launch Complex 9/10 remained intact. The complex was built at a cost of about $5 million with acceptance by the Air Force in July, 1960. Launch Complex 31/32 featured two bee-hive style blockhouses, one serving Launch Pad 31A and Silo 31B (south) and the other serving Launch Pad 32A and Silo 32B (north). Each missile silo was approximately 80 feet deep and 8 feet in diameter, and included underground equipment and access rooms. The silos were intended to come as close as possible to conditions under which the missiles would actually be deployed. Today, the two blockhouses are abandoned but remain intact, as do the flat pads and silos. In 1987, the Minuteman silos were filled with the remains of Space Shuttle Challenger and sealed with large cement lids. These remains are expected to be stored there indefinitely. Launch Complex 31/32 was open to visitors for many years, but due to deteriorating conditions the complex remains locked and is no longer accessible.
Blockhouse For Launch Pad 32A And Silo 32B Circa 2020
Blockhouse For Launch Pad 31A And Silo 31B Circa 2020
Launch Complex 31/32 Perimeter Fence Circa 2020
Challenger Debris Lowered Into Launch Complex 31/32 Missile Silo Circa 1987
Minuteman III In Silo 32B Circa 1968
Minuteman I In Silo 31B Circa 1962
Minuteman I At Silo 32B Circa 1962
Minuteman I In Silo Circa 1962
Minuteman I On Launch Pad 31A Circa 1961
Minuteman I On Launch Pad 31A Circa 1960
Launch Complex 31/32 Circa 1960
Launch Complex 31/32 Circa 1959
Blockhouse 31 Construction Circa 1959
Silo 31B Construction Circa 1959
Blockhouse 31 Construction Circa 1959
Silo 31B Construction Circa 1959